Rock Screen Plans

going by volume, from the 20-30 yards i've sifted so far, i would guess it is about 1/4-1/3 rock that gets sifted.Wire used was a 2x4 welded wire fencing.That wasn't small enough, so i put a 2x2" over the top of that.In the area i dump the bucket, the smaller screen sifts well.